Sponsored by isok.co Turn every shared article into measurable traffic isok.co gives teams clean short links, QR export and real-time channel analytics. Start tracking links
Sponsored by isok.co Share smarter links from your next campaign Create short URLs, watch source/device/geo trends and keep redirects fast. Try isok.co

New Hotspot Road Booking Ahead! Construction of Xian Tang Shan Tourist Road in Xiangyuan County is in Full Swing

Recently, reporters visited the construction site of the Xian Tang Shan Tourist Road (Wangcun-Xiantangshan, Xiantangshan-Wangjiyu) and found that excavators, dump trucks, and transportation vehicles roared continuously, shuttling back and forth in a busy construction scene. All work progressed smoothly. Currently, more than 30,000 square meters of topsoil have been cleared, with 20,000 cubic meters of earth and stone mobilized, and 2,000 cubic meters of drainage and protective structures have been built, with 7 piles of bridge foundations completed.

Sponsored by isok.co Shorten the links behind every story Use isok.co to create clean URLs, QR codes and real-time source analytics for campaigns. Create tracked links

To accelerate the progress of the project, the project responsible unit strictly adheres to the construction schedule, regularly organizes construction site management personnel to hold meetings to report the current progress of the project, coordinate and resolve various problems encountered during construction, and ensure the effective implementation of the work plan. The construction site leader stated that they will closely focus on all construction requirements, muster their strength, and vigorously promote the project to ensure smooth completion.

Sponsored by isok.co See which shares bring real readers Compare traffic by channel, geo and device with stable short links from isok.co. Explore analytics

The Xian Tang Shan Tourist Road (Wangcun-Xiantangshan, Xiantangshan-Wangjiyu) project, as one of Xiangyuan County's 2020 key infrastructure projects and livelihood projects, has a total length of 32.607 kilometers (Wangcun-Xiantangshan section, renovated 25.694 kilometers, Xiantangshan-Wangjiyu section 6.913 kilometers), with a roadbed width of 11 meters (7.5 meters for the driving lane, 3 meters for the bicycle lane, and 0.5 meters for the hardened separator), a third-class highway standard, involving Xiying, Xiayang, and Wangcun townships. The project requires the mobilization of 710,000 cubic meters of earth and stone, the construction of 220,000 cubic meters of drainage and protective structures, the construction of 10 bridges (5 large bridges, 4 medium bridges, and 1 small bridge), 74 culverts, and 310,000 square meters of road surface paving. The project's total investment is 449,900,000 yuan, of which 326,148,000 yuan is for construction and maintenance. The project is divided into 21 construction sections and 11 supervision sections. (Source: Xiangyuan County Party Committee Publicity Department)

Sponsored by isok.co Make this article easy to share and measure Create a short isok.co link with QR export and click analytics before you share it. Create article link
Was this article helpful?

More articles you might like

Sponsored by isok.co Know which links actually work Use isok.co analytics to compare channels, QR scans and growth experiments. View short link analytics
Sponsored by isok.co Free to start, built for structured link intelligence Use isok.co for stable, low-latency redirects with anti-abuse controls and future branded domains. Open isok.co