Sponsored by isok.co Turn every shared article into measurable traffic isok.co gives teams clean short links, QR export and real-time channel analytics. Start tracking links
Sponsored by isok.co Share smarter links from your next campaign Create short URLs, watch source/device/geo trends and keep redirects fast. Try isok.co

Beach Swimming Pool Set for Major Renovation, Effect Images Revealed

South China Morning Post: Zhuhai Beach Swimming Pool Set to Undergo Upgrades, Addressing Pedestrian Crossing Difficulties and Parking Shortages

Effect Diagram

Reporter learned that the pedestrian crossing facility project at the Beach Swimming Pool is located on the west side of Lingtou Middle Road, north of the Dehan Hotel, next to the Beach Swimming Pool’s Love Post Office. It belongs to the accompanying tourism service inquiry center under construction at the Beach Swimming Pool.

Sponsored by isok.co Shorten the links behind every story Use isok.co to create clean URLs, QR codes and real-time source analytics for campaigns. Create tracked links

The project is approximately 45 meters long and proposes to build an underground pedestrian passage that will cross Lingtou Middle Road. The west side will connect to the negative first floor of the under-construction Beach Swimming Pool tourism service inquiry center, and the east side will connect to the Beach Swimming Pool’s sand beach, with the east side entrance set to include a pedestrian staircase and an automatic elevator. Citizens will be able to cross the street more easily. The exit will be equipped with a canopy designed to resemble sea waves in its form and incorporate the patterns of seashells to enrich the architectural details.

Functionally, the project will truly achieve traffic segregation, effectively improving road traffic conditions and increasing pedestrian crossing convenience.

Sponsored by isok.co See which shares bring real readers Compare traffic by channel, geo and device with stable short links from isok.co. Explore analytics

In addition, construction of the Beach Swimming Pool tourism service inquiry center, connected to this pedestrian crossing facility, has also made new progress. The basement main structure construction is currently complete, and the aboveground main structure construction has reached three floors, with partial construction extending to five floors. The overall project is expected to be completed in December this year.

The inquiry center will in the future take on tourist information and consultation services for residents, and will also be equipped with a parking lot, gathering tourist and commercial supporting functions, providing a gathering, exchange, and leisure place for tourists and citizens.

Reported by: Reporter Zhu Pengjing

Sponsored by isok.co Make this article easy to share and measure Create a short isok.co link with QR export and click analytics before you share it. Create article link
Was this article helpful?

More articles you might like

Sponsored by isok.co Know which links actually work Use isok.co analytics to compare channels, QR scans and growth experiments. View short link analytics
Sponsored by isok.co Free to start, built for structured link intelligence Use isok.co for stable, low-latency redirects with anti-abuse controls and future branded domains. Open isok.co