Huhong District: Ordered Promotion of the Systematic Restart and Production of Scenic Areas in Yuanzhen Town
Recently, Huhong District has actively implemented the district and bureau's requirements for the resumption of work and production, while taking sufficient prevention and control measures, it organized cadres and workers to accelerate the progress of scenic spot and tourist attraction projects.

Bai Shan Scenic Area is a national AAA-level scenic area and has long been a favorite destination for enthusiasts. Since its transformation, Huhong Town has developed ecological tourism as its sunrise industry, and has worked tirelessly to upgrade and improve it. Taking advantage of the current key opportunity, the town organized workers to build two observation decks in Beipo to view the Huhuma River and Shaihai Deep Cliff Scenic Area.
Huhong Town's bureau completed the Cangshan Self-Driving Car Tourist Accommodation Camp in 2019. As the local management, in order to continuously improve the scenic spot infrastructure, the town organized cadres and workers to work overtime, strictly adhering to the three-high standards of high standards, high quality and high speed. The town organized groups of workers to inspect and repair the interior of the self-driving camp, accelerating the construction of wooden railing handrails outdoors, and ensuring the safety, durability and aesthetics of the wooden railings. The town stabilized the wooden railings at the edges and pillars with steel angle iron and used carbonization anti-corrosion treatment to ensure the safety of visitors after the scenic area is opened.

Currently, Huhong Town has completed the construction of two observation decks with an area of 20 square meters each, 520 meters of carbonization anti-corrosion treatment, and wooden railing handrail construction. It is expected to complete the construction of the restaurant entrance and steel frame villa entrance observation platform and 800 meters of carbonization anti-corrosion treatment and wooden railing handrail construction before April 20th.
Supervised by: Liu Dongxin, Reviewed by: Yang Hui, Edited by: Sun Fugui